1. Introduction

1.5 Report Format and Contents

The Constraints Study Report has been split into two volumes covering the northern and southern study areas respectively. Each volume has common sections giving a general introduction, the background to the scheme, the first public consultation and the initial review of the study area. Thereafter the report generally concentrates on either the northern or southern study area with individual chapters covering individual topics.

Specialist Socio-economic and Environmental studies were undertaken by the following, with their significant input to this report being gratefully acknowledged:

Socio-economic Brady Shipman Martin
Flora, Fauna and Fisheries Natura Environmental Consultants Ltd.

Cultural Heritage / Archaeology

Valerie J. Keeley Ltd.
Land Use and Agriculture Philip Farrelly & Co Ltd.
Landscape and Visual Brady Shipman Martin

Chapter 2 of this report discusses the background to the road scheme in more detail with particular reference to the NRA National Road Needs Study (July 1998)1, and the Irish Government's National Development Plan (2000 - 2006)2.

The First Public Consultation which took place in at the end of March 2001 and feedback generated from it is summarised in Chapter 3.

Chapter 4 describes the initial review of the study area undertaken and subsequent refinements made.

The constraints identified for each assessment topic are then presented in subsequent chapters as follows:

Chapter 5 Engineering and Topography
Chapter 6 Accidents
Chapter 7 Geology and Hydrogeology
Chapter 8 Socio-Economic Impact
Chapter 9 Flora, Fauna and Fisheries
Chapter 10 Archaeology and Cultural Heritage
Chapter 11 Land Use and Agriculture
Chapter 12 Landscape and Visual Aspects